Newly Finished Project: We, The Pizza

Arlington, VA

ADI completed the demolition and build-out of an existing coffee shop and transformed the space into a new pizza shop in Crystal City. This project was challenging due to an aggressive schedule coordinated down to the hour and a lack of interior space. The new build-out included new gas utilities, installation of 2 Capitive-Aire pizza hoods, marble service countertops, sneeze guards and new millwork. The floor was finished in a four-phase stain process, which resulted in a marble-like finish with stars scattered throughout. The exterior façade facing the mall was completed in a thin brick, which was painted and then stenciled with the logo.

To view more: http://www.adigc.com/projects_retail_WeThePizza.html

We, The Pizza

Newly Finished Project: Tech Shop Crystal City Retail Entrance

Arlington, VA

Unlike any other within the Crystal City Shops, ADI constructed a unique storefront for TechShop. The design utilized an acoustically rated glazing system, steel c-channels, high-end Moz panels and batten strips. In addition to the storefront, ADI performed the landlord work in preparation for TechShop – extensive concrete and tile demolition, coupled with over 10,000 sf of Ardex installation. Throughout this process, ADI worked concurrently with TechShop’s general contractor, navigating through unforeseen conditions, tight schedules and changing designs to deliver the store and storefront on time.

To view more: http://www.adigc.com/projects_retail_TechShop.html

Arlington, VA