Newly Finished Project: Ashburn Pediatric Dental Center

Ashburn, VA

ADI Construction completed the build out of a large high tech dental center in Ashburn, VA. The facility includes installation of over 18 TV’s, 10 video games and a complete automated lighting, HVAC and security system, as well as the infrastructure for a large 13 chair dental practice. The design included many radius walls, bulkheads and high-end finishes. The owner added extensive design changes during construction which required extensive tracking and coordination. ADI coordinated the work in the 5,600 SF facility with the owners dental equipment vendor and system automation/data/entertainment vendor.

To view more:

http://www.adigc.com/projects_healthcare_ashburn.html

Ashburn, VA

Advertisements

Breaking Ground! – Higher Achievement

Washington, DC

ADI Construction partners with Vornado / Charles E. Smith to break ground for the opening of the Higher Achievement headquarters project in Washington, DC. Higher Achievement provides rigorous after school and summer academic programs, which close the opportunity gap for middle school youth in at-risk communities, and ADI is proud to be a sponsor of this important organization.

To view more: http://www.adigc.com/about_events_higherachievement.html

Washington, DC

Newly Finished Project: Marriott Washington Lobby

Washington, DC

Working with restricted work hours and a tight schedule, ADI Construction renovated the main reception lobby of this four-star hotel for Marriott in Washington, DC. This transformation from traditional style to modern day design elements included two intricate chandeliers, leather bar panels, Lanko wooden mirror wall, and additional mirrored walls in the bar area. This phased renovation was completed while the hotel remained fully booked and operational.

To view more: http://www.adigc.com/projects_capital_marriott.html

Washington, DC

Newly Finished Project: Inova Gainesville Vein Vascular Imaging

Gainesville, VA

One of two projects that ran on the same schedule in a large new shell space. Vein and Vascular Imaging is a medical office suite offering X-Ray, future CT, angioplasty, and vascular treatment rooms. ADI worked closely with imaging equipment manufacturers to prepare the rooms to meet the equipment specifications, as well as coordinate equipment delivery and installation. This project required careful detailing for the installation of the large C-Arm machine. This specialized X-ray imaging machine allows patients and doctors to see results quickly. The device is designed to be comfortable and less invasive for patients.

 

To view more: http://www.adigc.com/projects_healthcare_vvi.html

Gainesville, VA