ADI Awards IFH Stop Gap Project

ADI is awarded Inova Fairfax Hospital Stop Gap project, advancing the company’s outstanding Healthcare Construction repertoire. ADI’s CHFM-certified Tom Bolton is the Senior Project manager on the job. The project is projected to finish in July 2010.

ABOUT IFH STOP GAP – The Inova Fairfax Hospital Stop Gap project will build infrastructure to support construction of the new South Patient tower. Two new critical power risers will be installed in the existing tower building that will serve a new electric room on each floor. These new electric rooms will be utilized in the future project. A new 40,000 CFM roof top air handler will be installed outside the existing tower building and ducted to the fifth floor to supplement the existing HVAC system. This new air handler will be redirected to serve the first floor with the future South Patient Tower project.

Inova Stop Gap

For more information, visit www.adigc.com/News/IFH%20Stop%20Gap.pdf

Celebrating the opening of Fair Oaks Hospital Imaging Suite

ADI Construction attended the grand opening of our newest medical building. ADI built out a 6,692 square foot Diagnostic Imaging Suite in a new medical office building on the Fair Oaks Hospital campus. The Imaging Suite was outfitted with a GE Discovery MR750 3.0T MRI, a GE Lightspeed CT, and a Phillips Optimus Rad Room. Special care was taken when installing this equipment in November, 2009.

The client was pleased with the attention to detail, especially the lighting, which is an important aspect of any imaging facility. Other aspects of the project included the construction of a lobby, patient dressing rooms, and a pantry.

Inova Imaging Suite

For more information, visit www.adigc.com/projects_healthcare_ImagingSuite.html